阜阳哪里有治痘痘的-【阜阳皮肤病医院】,阜阳皮肤病医院,阜阳治疗痘印哪些医院好,阜阳市皮肤医院那个好,阜阳治疗青春痘哪效果比较好,阜阳扁平疣多少钱呀,脂溢性皮炎治疗阜阳医院,阜阳红蓝光祛痘印要多少钱

SINGAPORE, July 10 (Xinhua) -- The upcoming Natural History Museum in Singapore launched a drive on Sunday to raise 12 million Singapore dollars (9.8 million U.S. dollars) by the end of the month to buy three dinosaur fossils from a company in Wyoming, the United States.The three dinosaurs on offer from the company Dinosauria International, thought to be a family, were found between 2007 and last year in the United States, the Straits Times reported on Sunday.Appollo and Prince, the two adult diplodocid sauropods, is about 24 meters long, while the baby Twinky is about 12 meters.The natural history museum is expected to be completed by 2014. The three dinosaur fossils will cost 870 million Singapore dollars, and an additional 370 million Singapore dollars will be spent to set up the exhibition."They wanted the museum to tell the story of the history of life and evolution. Dinosaurs are the history of life," said Professor Peter Ng, director of the Raffles Museum of Biodiversity Research, referring to the approval from the scientific advisory committee for the acquisition.The Raffles Museum of Biodiversity Research of the National University of Singapore went on an intensive fund raising campaign last year to build the dedicated Natural History Museum.The museum said it has found the amount to be challenging. It is therefore appealing for help from the public through the media."The idea was always to have a central gallery and put something there that would make people go 'Whoa!,'" said Ng.
SHENYANG, Aug. 16 (Xinhua) -- Two more cutaneous anthrax infections were reported in northeast Liaoning Province, bringing the total number of people who were hospitalized for the disease to 32, health authorities said Tuesday.The two cases were found Monday in Donggang City, more than 100 km away from the city where the disease was first reported, the Liaoning Provincial Health Department said in a statement.Health experts noted that all the cases originated from the the same source.As of 8 p.m. Monday, four cases have been confirmed while 28 others were still being investigated, according to the health department.An initial investigation by local health authorities showed that the patients contracted the disease after direct contact with diseased cattle.The government of Liaoning has since killed or disinfected more than 400 heads of cattle in the province and carried out a survey among over 20,000 people.Cutaneous anthrax is an infection of the skin caused by direct contact with infected animals or animal products. It is rarely fatal if treated.

JIUQUAN, Gansu, Sept. 26 (Xinhua) -- Engineers are conducting the final preparations before launching China's first space laboratory module at the end of this week at a launch center in northwest China.The unmanned Tiangong-1 module was originally scheduled to be launched into low Earth orbit between Sept. 27 and 30. However, a weather forecast showing the arrival of a cold air mass at the Jiuquan Satellite Launch Center forced the launch to be rescheduled for Sept. 29 or 30, depending on weather and other factors."This is a significant test. We've never done such a thing before," said Lu Jinrong, the launch center's chief engineer.A full ground simulation was conducted on Sunday afternoon to ensure that the module and its Long March 2F carrier rocket are prepared for the actual launch.Cui Jijun, commander-in-chief of the launch site system and director of Jiuquan Satellite Launch Center, told Xinhua that they developed a new target spacecraft for the mission and made more than 170 technical improvements to the Long March 2F, China's manned orbital carrier rocket.Engineers have also made more than 100 updates at the launch site in order to make it compatible with the Tiangong-1, Cui added.The module will conduct docking experiments after entering orbit, which is the first step in China's space station program.Cui said the launch site has an updated computer center and command monitoring system and increased ability to adapt to changes in mission conditions, as well as the resources to handle both the launch and command duties. An integrated simulation training system for space launching has also been developed for the docking mission.The mission comes just one month after the Long March 2C rocket malfunctioned and failed to send an experimental satellite into orbit. The Tiangong-1 mission was subsequently rescheduled in order to allow engineers to sort out any problems that might occur during the launch.Cui said that engineers conducted a two-month comprehensive technical check on equipment at the launch site from March to May. The safety and reliability of all the instruments have been significantly improved."[The launch site] has the full conditions to conduct the Tiangong-1 mission," said Cui.The Tiangong-1 will remain in orbit for two years. During its mission, it will dock with China's Shenzhou-8, -9 and -10 spacecrafts.Unmanned docking procedures will be an essential step toward China achieving its goal of establishing a manned space station around 2020.
LOS ANGELES, July 27 (Xinhua) -- The Juno spacecraft of the National Aeronautics and Space Administration (NASA) arrived at its launch pad at the Cape Canaveral Air Force Station in Florida on Wednesday, ready for a mission to Jupiter to study the solar system, the Jet Propulsion Laboratory (JPL) said.The solar-powered, Jupiter-bound spacecraft was secured into place on top of its rocket at 10:42 a.m. EDT (7:42 a.m. PDT), said JPL in Pasadena, California.Juno will arrive at Jupiter in July 2016 and orbit its poles 33 times to learn more about the gas giant's interior, atmosphere and aurora, according to JPL."We're about to start our journey to Jupiter to unlock the secrets of the early solar system," said Scott Bolton, the mission 's principal investigator from the Southwest Research Institute in San Antonio, Texas. "After eight years of development, the spacecraft is ready for its important mission."Now that the Juno payload is atop the most powerful Atlas rocket ever made -- the United Launch Alliance Atlas V 551 -- a final flurry of checks and tests can begin and confirm that all is go for launch, according to JPL.The final series of checks begins Wednesday with an on-pad functional test. The test is designed to confirm that the spacecraft is healthy after the fueling, encapsulation and transport operations."The on-pad functional test is the first of seven tests and reviews that Juno and its flight team will undergo during the spacecraft's last 10 days on Earth," said Jan Chodas, Juno's project manager at JPL. "There are a number of remaining pre- launch activities that we still need to focus on, but the team is really excited that the final days of preparation, which we've been anticipating for years, are finally here. We are ready to go. "The launch period for Juno opens Aug. 5, 2011, and extends through Aug. 26. For an Aug. 5 liftoff, the launch window opens at 11:34 a.m. EDT (8:34 a.m. PDT) and remains open through 12:43 p.m. EDT (9:43 a.m. PDT), JPL said.Managed by JPL, the Juno mission is part of the New Frontiers Program managed at NASA's Marshall Space Flight Center in Huntsville, Alaska.
LONDON, Sept. 22 (Xinhua) -- A British publisher on Thursday issued an "unauthorized autobiography" of the founder of the controversial Wikileaks website Julian Assange.Assange became a global figure after he published 250,000 secret United States diplomatic cables on his Wikileaks website, which became a serious embarrassment to the American government.He was then accused by two women of rape when he was in Sweden. Swedish police said they wanted to question him, and issued a European Arrest Warrant in 2010 for him.Assange, 40, denies the allegations and surrendered himself to police in London at the end of 2010, and the Swedish authorities applied for his extradition to face questioning.Assange fought the extradition bid in the English courts, fearing that he could face further extradition from Sweden to the United States where he could face criminal charges related to the publishing of the secret cables, but failed.He appealed against the extradition ruling in July and a final decision on the case will be made by senior English judges, probably before Christmas.Assange agreed to cooperate with Edinburgh-based publisher Canongate in publishing an autobiography and had 50 hours of interviews with a ghostwriter between January and March this year, while he was on bail awaiting an outcome of the extradition hearings.He received a 500,000 pound advance (about 768,000 U.S. dollars) for the book.Publisher's spokesman Liz Sich told Xinhua Thursday, "It's an unauthorized autobiography -- it is his words. He was contracted to write his autobiography in December; a ghostwriter was assigned to it, approved by the publisher and Julian and an intense amount of work was done in the first three months of 2011. The first draft was delivered on schedule at the end of March. After that there was an hiatus and nothing happened; in June Julian decided he wanted to tear up the contract."Assange has opposed publication, but Sich said, "It is very much Julian's words, it is written in the first person. He didn't want it to be published but he was in breach of his contract. He couldn't pay the advance back because he had used it to pay his lawyers."The book is available only in English at the moment, but a Dutch publisher and a Turkish publisher said they would print translations in their languages, and other foreign language editions are also likely.
来源:资阳报