到百度首页
百度首页
梅州宫颈炎是什么病
播报文章

钱江晚报

发布时间: 2025-05-31 13:12:28北京青年报社官方账号
关注
  

梅州宫颈炎是什么病-【梅州曙光医院】,梅州曙光医院,梅州急性附件炎 防治,梅州阴道紧缩术的价钱,梅州阴部瘙痒 白带多,梅州宫颈炎和宫颈糜烂的症状,梅州女性滴虫性阴道炎如何治疗,梅州有关宫颈炎怎样治疗

  

梅州宫颈炎是什么病梅州专业妇科检查医院,梅州合理打胎总费用要多少钱,梅州女性阴道炎该怎么办,梅州市做人流的医院,梅州治霉菌尿道炎的医院,梅州怀孕多久可以打胎,梅州那个妇科医院技术好

  梅州宫颈炎是什么病   

Chinese auditors said it found no embezzlement or misappropriation of construction fund in the ongoing Three Gorges project, however, they also detected some problems and flaws in the project management. The National Audit Office (NAO) said the overall quality control of the project was fine and total investment were kept under control. All 11 major projects were up to the standards, as were main materials such as steel and cement, said an audit report by the NAO. It said total inflation-adjusted investment, expected to be 78 billion yuan, could be more than 35 billion yuan less than planned in 1994. By the end of 2005, the country had spent 64.2 billion yuan on the project. The NAO, however, also detected extra construction costs of 488 million yuan, most of which was incurred by project construction contractors who exaggerated their expenditure. The office also found 20.4 hectares of land illegally used without governmental permission, while another 110 hectares approved for use had been left idle. "The problems are largely due to lack of laws and regulations and imperfection in internal control," said Pan Xiaojun, senior official with the NAO. The company said it had already corrected the use of 139 million yuan of fund involving violation of rules, and a total 17 measures had been adopted to improve management over the project. The office said 21 power station construction projects, most of which involved a single contract value of less than 10 million yuan were not put out to tender. A few construction companies were discovered to have subcontracted their projects against regulations and obtained illegal charge of 53.45 million yuan. About half of the 1,448 supervisors sampled were found to have no licenses for the work. The China Three Gorges Corporation said it had strengthened the implementation of public bidding to ensure the fairness of the results and avoid the influence of people, and it also added detailed terms about contracting in contracts to prevent illegal contracting. The unlicensed supervisors had been fired and supervision over the project supervisors were enhanced, according to the company. The report said that the project across the Yangtze River, the construction of which began in 1993, had played a "better-than-expected" role in flood prevention, power generation and shipping. "It's possible to put the project into full operation by 2009 as planned, and the project is running a bit ahead of schedule," it said. The fourteen generators in a power plant had been put into operation a year earlier than planned in 2005, the office said. Upon its completion, the Three Gorges dam will produce 85 billion kwh of electricity annually for supply to central and eastern China. The dam, which is 2,309 meters long and 185 meters high, will be installed with 26 turbo-generators, each with a generation capacity of 700,000 kilowatts. The audit, which took 150 auditors more than six months to complete, covered areas including fund raising, management and use, construction management as well as benefit of the project.

  梅州宫颈炎是什么病   

WASHINGTON - China warned the United States on Thursday against "groundless smear attacks" against Chinese products and said it was working responsibly to address concerns over a spate of recent food safety scares. "The Chinese Government has not turned a blind eye or tried to cover up. We have taken this matter very seriously, acted responsibly and immediately adopted forceful measures," said a statement by China's embassy in Washington. "Blowing up, complicating or politicizing a problem are irresponsible actions and do not help in its solution," the Chinese mission said in a rare policy pronouncement. "It is even more unacceptable for some to launch groundless smear attacks on China at the excuse of food and drug safety problems," it said. Echoing the Beijing government's complaints about US media reports, the embassy said food safety concerns were not unique to China, 99.2 percent of whose food exports to the United States in 2006 met quality standards. Problematic US imports from China -- including toxic ingredients mixed into pet food and recalls of toy trains and toothpaste -- were isolated cases and "hardly avoidable" amid huge and rapidly growing bilateral trade, the statement said. "It is unfair and irresponsible for the US media to single China out, play up China's food safety problems and mislead the US consumers," it added. Appealing for strengthened cooperation between Chinese and US food inspection authorities, the statement urged Americans to "respect science and treat China's food and drug exports fairly."

  梅州宫颈炎是什么病   

The government of Macao Special Administrative Region (SAR) logged 3.962 billion patacas (around 495 million U.S. dollars) in total revenue in January 2008, up 37 percent year-on-year, the government said.     The latest statistics released by the SAR government showed that a major share of the total revenue for January 2008 came from direct gaming taxes, which saw an increase of 30.9 percent year-on-year to 3.09 billion patacas (386 million U.S. dollars).     Thanks to the booming gaming industry in the island city, which has seen the opening of its 28th casino by the end of 2007, Macao's gaming taxes grew by 48 percent over the previous year to 29.3 billion patacas (3.7 billion U.S. dollars) in 2007, leading to an overall surplus of 21.8 billion patacas (2.7 billion U.S. dollars) in public finance, according to official statistics.     In its latest research report released Friday, the Bank of China Macao Branch forecast that due to the dynamic development of gaming and tourism industries and ballooning fixed-asset investment in the city, Macao's GDP will keep a growth rate of 13 percent in 2008, which is lower than the 27 percent rate of the previous year.

  

NANJING: Jiangsu province will constantly focus on environmental protection while maintaining strong momentum in economic development in the next five years, acting governor Luo Zhijun said in his work report to the first session of the 11th provincial people's congress on Friday.The province witnessed fast economic growth in the past five years with gross domestic product (GDP) increasing at an annual average rate of 14.5 percent, one of the highest rates in the country, official figures showed.However, such economic development has had a negative impact on the environment, Luo said.Workers try to clean a major moat of algae in Suzhou, Jiangsu province, last July. A massive algae bloom spread out last summer in several of the country's large lakes, including Taihu lake in Jiangsu and Dianchi lake in Yunnan province. [China Daily] Last May, more than 1 million residents in the city of Wuxi suffered water shortages when a large-scale, blue-green algae outbreak hit Lake Taihu, one of the city's main sources of drinking water.The algae comprise microscopic organisms that are naturally present in waters. They grow easily in polluted waters and can starve the water of oxygen, killing aquatic life.The water quality of the lake has improved, but the incident was seen to have sent a signal to local government that the economy should not grow at the expense of the environment."We've learned a lesson from the incident, that environmental protection should take precedence over GDP growth," said Mao Xiaoping, mayor of Wuxi and deputy to the provincial congress.The provincial government will allocate more than 2 billion yuan (7 million) to clean up Taihu lake this year, Luo said in his report.Over the past five years, the provincial government has made strenuous efforts to protect the environment while speeding up economic development, Luo saidAll over the province, 2,713 small chemical factories, one of the main sources of pollution, have been ordered to close, while many other heavy polluting enterprises have been urged to upgrade their environmental protection facilities to be up to standards, Luo said.Similarly, 75 sewage treatment plants have been built in the cities with a daily disposal capacity of 3.78 million tons of wastewater, he said."We will continue to encourage technology renovation and push forward industrial restructuring in the next five years," said Luo.The authorities will also support research of technologies to improve water and air quality, Luo said.At the same time, the province will promote the use of energy-saving devices and recycling, he said.Measures are being taken to ensure that no new projects will be approved before they meet all requirements for environmental protection, Luo added.To that effect, the metallurgy, chemical, building materials, electrical power and textile industries will all be under close supervision, he said.

  

SHENZHEN -- Construction began Saturday on an experimental facility which will offer a platform for Chinese and foreign scientists to work together for discovering a new kind of neutrino oscillation in Shenzhen, South China's Guangdong Province.It was the second biggest cooperation program Chinese high energy scientists ever conducted with other foreign counterparts since October 1988 when the positive-negative electron collider was built in Beijing.Through the collider, scientists from China and the United States have cooperated and carried out legions of scientific research.Saturday's construction commencement function was attended by more than 100 people, including government officials and foreign diplomats, such as Dr. Robin Staffin, Associate Director of Science in the US Department of Energy.Neutrino Oscillation is an intriguing behavior of a sub-atomic particle called neutrino.And the new facility is being built in the mountain near Daya Nuclear Power Plant, which has four reactors with a combined thermal output of 11.6 million kw in operation, and Ling'ao nuclear power plant is not far away. Both nuke power plants will serve as sources of anti-neutrinos for the experiments when the facility is finished.Workers will build three underground experimental halls which will be connected by long tunnels in the mountain that shields the experiment from unwanted cosmic radiation.Each hall will feature a 10-m deep water-pool within which eight anti-neutrino detectors will be deployed. The water protects the detectors from nearby radiation that interferes with the measurement, and helps identify surviving cosmic radiation.And the first experimental hall is expected to be ready by the end of 2008. Commissioning of the detectors in this hall will take place in 2009.Civil engineering construction is anticipated to last about two years, with installation of the last detector scheduled for 2010.Upon completion of the new facility, more than 190 scientists from six countries and regions including the Chinese mainland, Hong Kong, Taiwan Province, the United States and Russia will come over to do research work, according to Chen Hesheng, Chief of the Institute of High Energy Physics with the Chinese Academy of Sciences (CAS).The facility will have a budget of 250 million yuan (US.25 million). And China will be responsible for infrastructure construction and making of four detectors. And the United States will be responsible for making of the rest of the detectors.Wang Yifang, chief scientist on the experiment, said he was confident that the program would make an important contribution to finding a new breakthrough in China's research efforts in particle physics, starting a new horizon in world's neutrino research, and to improving the overall strength of China in science and technology.

举报/反馈

发表评论

发表